Permitted Development

Development consisting of a change of use of a building and any land within its curtilage from a use as an agricultural building to use as a state-funded school falling within Class F.1(a) (provision of education) of Schedule 2 to the Use Classes Order .

Development Not Permitted

Development is not permitted by Class S ifโ€”

  • (a)the building was not used solely for an agricultural use as part of an established agricultural unitโ€”
    • (i)on 20th March 2013, or
    • (ii)in the case of a building which was in use before that date but was not in use on that date, when it was last in use, or
    • (iii)in the case of a building which was brought into use after 20th March 2013, for a period of at least 10 years before the date development under Class S begins;
  • (b)the cumulative area ofโ€”
    • (i)floor space within the existing building or buildings, and
    • (ii)land within the curtilage of that building or those buildings,
  • (c)the site is occupied under an agricultural tenancy, unless the express consent of both the landlord and the tenant has been obtained;
  • (d)less than 1 year before the date development beginsโ€”
    • (i)an agricultural tenancy over the site has been terminated, and
    • (ii)the termination was for the purpose of carrying out development under Class S,
  • (e)development under Class A(a) or Class B(a) of Part 6 of this Schedule (agricultural buildings and operations) has been carried out on the established agricultural unitโ€”
    • (i)since 20th March 2013; or
    • (ii)where development under Class Q begins after 20th March 2023, during the period which is 10 years before the date development under Class Q begins;
  • (f)the site is, or forms part ofโ€”
    • (i)a site of special scientific interest;
    • (ii)a safety hazard area; or
    • (iii)a military explosives storage area;
  • (g)the site is, or contains, a scheduled monument; or
  • (h)the building is a listed building.

Conditions

โ€”(1)ย Development is permitted by Class S subject to the following conditionsโ€”

  • (a)the site is to be used as a state-funded school falling within Class F.1(a) of Schedule 2 to the Use Classes Order and for no other purpose, except to the extent that the other purpose is ancillary to the primary use of the site as such a state-funded school; and
  • (b)before changing the use of the site under Class S the developer must apply to the local planning authority for a determination as to whether the prior approval of the authority will be required as toโ€”

(2)ย Subject to sub-paragraph (3), development under Class S must begin within a period of 3 years starting with the prior approval date.

(3)ย Where, in relation to a particular development under Class S, planning permission is granted on an application in respect of associated operational development before the end of the period referred to in sub-paragraph (2), then development under Class S must begin within the period of 3 years starting with the date that planning permission is granted.

(4)ย For the purposes of sub-paragraph (3), โ€œassociated operational developmentโ€ means building or other operations in relation to the same building or land which are reasonably necessary to use the building or land for the use proposed under Class S.

Contact Us